Modules shown at the design rate: one 700 W module every 5 seconds, per machine. Select a stage to watch it from the start. Site map digital twin, piles and rails are time-compressed.
Plan view · 54 modules per row · one machine per row
Speed
100 MW in five weeks.
Labor
Every pile, rail and module installed by robots.
Land
~800 kW per acre.
Resiliency
Every module fully supported.
100 MW construction timeline
Per robot line.
Our first principles designed structure provides the deterministic geometry autonomous machines need.
The result
5sec
One module placed every 5 seconds, per machine
~5weeks
100 MW built in about 5 weeks per team, from construction start to mechanical completion
~⅓land
About one-third the land per megawatt
Smallteams
Small teams of people manage operations and staging. Machines build the structures and install modules.